S. Hall, Ripon:
| |
|
Client: |
|
Private
Client |
|
| |
|
Project
Lead/Architect: |
|
Lightly
and Lightly |
|
| |
|
Interior
Designer: |
|
ISIS
Interior Design |
|
| |
|
Contract
Period: |
|
55
weeks |
|
The contract involved major internal re-ordering
of this eight-bedroomed (all with en-suite) mansion house including
re-wiring, plumbing, heating and plastering. The existing coach
houses were restored and refurbished to provide a first floor
gymnasium and ground floor garages.
The exterior of the property received render fabric
repairs and was re-decorated to its original condition.
A large indoor swimming pool was built in the courtyard
area of the ground and is pictured below.
The owners of this lovely property lived in a building
adjacent to the main house whilst works were being carried out.
The Pool House

The Pool


|